Director de operaciones/plant manager

Fra*** ***** (XX años)
Director General de Operaciones en Raloy Lubricantes
UAEMex
Acambay de Ruíz Castañeda,
Estado de México
Este candidato esta dispuesto a trasladarse
|
Experiencia
Director General de Operaciones
Raloy Lubricantes
dic 2019 - Actualmente
Campus Director, Responsible for the site’s operations in Santiago Tianguistengo, Mexico.
• Operations / Business / Engineering / Quality / Manufacturing / Supply Chain.
• Implement KPI’s in these sites.
• Keep plant indicators on target.
• Safety Culture improvement, TCIR reduction from 3.1 to 0.6
• Reduces recordable incidents from 36 to 2 in the first six months.
• Overall customer satisfaction, reduction of customer complaints from 96 to 6.
• Full responsibility for P&L, Value add positive every month.
• Waste and scrap reduction, from 3% to 1.2% and increase productivity by 8%.
• Achieve the annual savings goal, 3.0 MUSD in the first year.
• Increase capacity of the Lubricant Plant by 30% and at ZarKruse by 60%.
• Downtime reduction from 22% to 7%, through of TPM Implementation.
• Ensure the correct performance of human and material resources.
• Reduce the variations of FG & RM through WMS Implementation.
• Achieve the Certification of ISO9001 & IATF16949 Raloy Plant and ISO9001 ZarKruse.
• Project management with return on investment in less than two years.
• Development of new products for OEM customers.
Gerente General
Gates Corporation
oct 2017 - oct 2019
Plant Manager.

• Responsible for the Toluca Plant operations.
• Keep site KPIs metrics on target
• Safety Culture improvement, TCIR reduction from 1.41 to 0.32.
• Overall Customer Satisfaction, customer compliance reduction from 121 to 14.
• Full responsibility for P&L, value add positive every month.
• Waste and scrap reduction for 10% every year and Productivity increase 6% every year.
• Achieve annual savings goal, 6.5 MUSD every year.
• Increased Toluca Plant capacity 15%, from 169K to 195K units per day.
• Downtime reduction from 16% to 3.6%, through of TMP Implementation.
• Ensure the correct performance of human resources and materials.
• Business Development.
Operations Manager
Gates Corporation
2010 - 2016
• Responsible for six manufacturing areas in Toluca Plant.
• Ensure the correct performance of the materials and human resources.
• Develop continuous improvement projects.
• Increased Toluca Plant capacity 15%, from 143K to 164K units per day.
• Achieve annual savings goal, 6.0 MUSD every year.
• Increase the customer service level from 87% to 95%.
• Keep KPIs metrics on target.
• Capex Justification.
Business Unit Manager.
Gates Corporation
2005 - 2009
• Responsible for 16 production cells.
• Give support to the areas of planning, quality, engineering, manufacturing and materials.
• Keep BU KPIs metrics on target.
• Develop transfer plan (pilot runs, ramp up, mass production...).
• Ensure the correct performance of the materials and human resources.
• Develop continuous improvement projects.
• Achieve annual savings goal.
• Capex Justification.
Production Leader
Gates Corporation
1990 - 2002
• Supervise production areas.
• Develop continuous improvement projects.
• Implement 5S and TPM.
• Achieve the production goals.
• Use statistical tools for problem solving.
Formación
Computational Systems Engineer,
UAEMex

          
          
Six Sigma Champion, Six Sigma Consultants, Inc.
Six Sigma Consultants, Inc.

          
          
eXplore Manager Development Program.
DDI, Kansas City, USA.

          
        
Idiomas
Español - Nativo
Inglés - Avanzado
Otros datos
Education:
Education:
• eXplore Manager Development Program. DDI, Kansas City, USA.
• Six Sigma Champion, Six Sigma Consultants, Inc.
• Diploma in Finances, EBC University.
• Master Black Belt, Advanced Quality System.
• Black Belt, Advanced Quality System.
• Lean Manufacturing Tools, Productivity de Mexico.
• Computational Systems Engineer, Universidad Autónoma del Estado de México.
Currículums relacionados